Anambra State Road Traffic Management Agency

ARTMA Team Mount Route Diversion Signs In Preparation For The Construction Of Ekwulobia Flyover

ARTMA Report 18 Jun, 2023

ARTMA REPORT

Saturday, 17th June 2023

Mr. Governor, Prof Charles Chukwuma Soludo has on a daily basis continued to turn Anambra into a construction site.

From Anambra North to Central then South, the mantra ‘Solution is here’ is on the lips of all.

ARTMA today visited Ekwulobia to access the level of work done in preparation for the Ekwulobia flyover.

We are fully aware that a lot of diversions would be needed for the construction period as about 500 meters on all roads around the existing Ekwulobia roundabout will be blocked.

Diversions to link Awka, Uga, Oko, Igboukwu, Ufuma, and Umueze while avoiding the Ekwulobia roundabout are being installed to help drivers who are not so conversant with the axis.

Drivers are advised to look ahead for diversions.

Solution Is Here